Suze Garstman (BSc)

Suze Garstman (BSc)

The concept of FF-ICE is to reduce the limitations of the current flight plan 2012 in order to support the future environment as detailed in the global ATM operational concept. Which concept is to support future ATM operations. Through the EU implementing rule 118/2021 phase 1, a.o. the introduction and use of a new flight plan will be mandatory 2025, December 31st. To reach this goal it is necessary to investigate if and how these new flight plan alterations can and will be supported by LVNL and her stakeholders.  Today’s flight plan presents the ATCO and other stakeholders the initial intend of a flight. No modifications during the flight are possible. However, FF-ICE phase 1 is designed to manage this problem specially towards Trajectory Based Operations. This new flight plan will be introduced to provide richer route/trajectory descriptions to support the efficient use of air space worldwide. This research aims to identify the alterations already in place or needed within LVNL and her stakeholders to comply with EU implementing rule 118/2012.

Graduated: May 2025